Roof Area & Replacement Cost Calculator

Roof surface area, squares and shingle bundles from your dimensions and pitch, plus an itemized replacement cost range with every price source shown.

Updated · Recently improved tools

Measure the roof

One rectangle per section, at one pitch. Use extra sections for a garage or porch roof, and do not let sections overlap: where two roofs meet, the shared part would be counted twice.

Material and job

percent; about 10 for a simple gable, 10 to 15 for a hip
1.00 = the national ranges below; 1.20 = labor 20% dearer. Set it from a real local quote.
a label for your report only. It does not change any price.
percent of the roof; 0 if unknown, but see the note
dollars; ask your building department
percent on top of everything

Your estimate

— estimated replacement cost, a planning range and not a quote

—
sq ft of roof surface
—
roofing squares (100 sq ft)
—
sq ft to order, with waste
—
to buy
—
lineal ft of ridge and hip cap

Where the money goes

ItemLowHigh
Estimated total——

Roof sections

SectionShape and pitchPlan with overhangSurface

The prices, and where they come from

National planning ranges in US dollars per square foot of roof surface, checked in November 2026 against the published 2026 cost guides listed below. Covering and supplies are priced on the order area (with waste), labor on the roof surface. They are ranges because real quotes differ by contractor, city, access, product grade and season; no single figure here would be honest. Nothing is looked up by ZIP code: no maintained, trustworthy ZIP-level roofing price data exists for this page to read.

MaterialCoveringSuppliesLaborInstalled
Architectural asphalt shingles$1.10–$2.40$0.45–$0.95$2.20–$3.50$3.75–$6.85
3-tab asphalt shingles$0.80–$1.30$0.40–$0.80$1.95–$2.90$3.15–$5.00
Standing-seam metal$4.00–$7.70$0.70–$1.40$4.50–$7.70$9.20–$16.80
Corrugated or ribbed metal (exposed fasteners)$2.00–$4.75$0.55–$1.20$2.90–$5.00$5.45–$10.95
TPO membrane$1.15–$2.75$0.50–$1.10$2.35–$5.00$4.00–$8.85
EPDM rubber membrane$1.00–$2.35$0.50–$1.10$2.70–$4.65$4.20–$8.10
Clay tile$4.00–$9.75$0.80–$1.85$4.00–$10.60$8.80–$22.20
Wood shake$2.65–$6.00$0.55–$1.30$3.75–$6.60$6.95–$13.90
  • Removal and disposal (a rough range): $0.90–$2.20 per sq ft for the first layer and $0.50–$1.05 for each further layer, times the local labor multiplier. Published 2026 figures disagree here: Fixr puts tear-off at about $0.50 per sq ft on average and up to $1.50 for heavy materials or several layers, while other guides say $1 to $2.50.
  • Decking: $3.00–$7.50 per sq ft replaced, material and labor (Fixr: $2 to $8).
  • Permits: your own budget, plus or minus 20%. Published 2026 ranges run about $100 to $500 for a house.
  • Complexity: the 1.20 and 1.42 labor factors are planning assumptions, not a published table.

Installed ranges were checked against: Fixr, roof replacement (Feb 2026), whole-roof prices for about 2,000 sq ft of roof, so asphalt about $3 to $5 per sq ft, architectural shingles $4 to $16, clay tile $7 to $14 and cedar shake $5 to $15, plus tear-off, decking and permits; Fixr, metal roofing (Jan 2026): standing seam $7 to $30, exposed-fastener panels $3.50 to $26; Fixr, TPO (Sep 2026): $4.50 to $16, with 45-mil from $3; Roof Observations, EPDM (Jan 2026): $4.20 to $14.25; This Old House, new roof cost (Oct 2026): averages of $5.16 for asphalt, $13.15 for wood shake, $19.30 for metal and $22.21 for clay tile; Subcontractor Hub (Sep 2026): asphalt $3.50 to $5.50, metal $8 to $14, tile $10 to $18. The split of each installed range into covering, supplies and labor is this page's own planning assumption; the guides put labor at 40 to 65 percent of a job. Minimum slopes are from the International Residential Code, chapter 9.

A second opinion

For another take on the area alone, try New Roof Calc's roof square footage calculator. It is an independent site: Absurd Tools is not affiliated with it and does not vouch for its figures.

How to use

  1. Enter each part of the roof as a rectangle with its shape, pitch and overhang, or switch to a roof area you already have from a measurement report.
  2. Pick the covering, the waste allowance and how many old layers come off.
  3. Set the local labor multiplier from a real quote if you have one; the ZIP code is only a label for your report.
  4. Read the itemized low and high range, then copy, download, print or share the estimate.

Frequently asked questions

Does a hip roof have more area than a gable roof?

No. On the same footprint, with the same overhang and one pitch throughout, the two have exactly the same surface, because every plane is stretched by the same slope factor. What changes is the edges. With no overhang, a 40 by 30 foot gable at 6/12 has a 40 foot ridge; the hip version has a 10 foot ridge and four hips totaling 90 feet, so two and a half times the cap, and many more angled cuts. That is why roofers allow about 10 percent waste on a simple gable and 10 to 15 percent on a hip.

Why is my roof bigger than the footprint of the house?

Two reasons. The overhang adds twice its width to each dimension, so a 12 inch overhang turns a 40 by 30 foot house into a 42 by 32 foot roof plan. Then the slope stretches that plan by the square root of one plus the pitch over 12, squared: 5.4 percent more at 4/12, 11.8 percent at 6/12, and 41.4 percent at 12/12, which is not double, as is often guessed. Together that makes the example roof 1,502.6 square feet on a 1,200 square foot footprint.

What is a roofing square, and why do I buy more than my roof area?

A square is 100 square feet of roof surface, the unit roofers price and order in. You buy more than the surface because starter rows, cut pieces at hips, valleys and edges, and damaged pieces all use material. With 10 percent waste the example roof needs 1,652.9 square feet, which is 16.53 squares. Asphalt shingles come three bundles to a square and nobody sells part of a bundle, so that rounds up to 50 bundles.

Why does the ZIP code not change the price?

Because there is no maintained, trustworthy source of roofing prices by ZIP code for a free page to read, and a number that looks local but is not would be worse than an honest national range. Labor is the largest and most local part of the bill, at 40 to 65 percent of the total in the cost guides checked, so the page gives you a labor multiplier instead. Set it from a real local quote and the labor and tear-off lines follow it.

Should I tear off the old roof or put the new one over it?

Tearing off costs more now (this page uses a rough $0.90 to $2.20 a square foot for the first layer, because published figures disagree), but it is the only way to find and replace rotten decking, and the model residential code does not allow a new layer over two or more existing layers, over slate or tile, or over a roof that is wet or worn out. An overlay also adds weight and can shorten the life of the new roof. Ask your building department what your area allows.

Which coverings work on a low-pitch roof?

The International Residential Code sets a floor for each. Single-ply membranes such as TPO (a thermoplastic sheet) and EPDM (a synthetic rubber), and standing-seam metal, go down to a quarter inch per foot. Asphalt shingles need at least 2/12, with doubled underlayment up to 4/12. Clay and concrete tile need 2 1/2 in 12. Wood shakes, and metal panels with lapped seams and no sealant, need 3/12. Below those, water driven by wind gets back under the laps, and the page warns you when a section is too flat for the covering chosen.

How close will a real quote be to this range?

Treat it as a planning range, not a bid. It leaves out things that only an inspection reveals or that vary job by job: rotten decking beyond your allowance, chimney and skylight flashing, gutters, ventilation upgrades, structural repairs, hard access, and the minimum charge many roofers set for small jobs. The prices are national ranges checked against published 2026 cost guides, listed on the page. Get at least three written quotes before deciding anything.

🔒 This tool runs entirely in your browser. Nothing you enter is uploaded, logged, or stored.